Northside Aztlan Community Center 

Battery Energy Storage Solution

120 kW / 280 kWh

Fort Collins, CO

Completed 2022

Kronus Engineering was approached by Northside Aztlan Community Center to scope, design, and manufacture a lithium- ion battery system to provide backup energy storage for the site. Kronus customized, tested, and installed its Vault 280kWh containerized system to meet the project requirements.

Purpose

Provide reliable, flexible, and safe backup energy storage services to a community center in Fort Collins, CO.

Connectivity

The battery system needed be able to connect to onsite solar and a diesel generator.

Containerized

10ft weatherized ISO container

Safety

These batteries are UL1973 & UL9540a certified, and the inverters are UL1741-SA certified.